Minor Projects Facilities
Submit a Ticket
Have questions? Email us at projects@clas.ufl.edu or use the form below to submit a ticket. To submit a ticket to Facilities Services, click here.
Submit a Project Ticket
Helpful Links
CLAS Facilities Operations collaborates closely with the University’s two primary facilities departments: Planning, Design, and Construction (PD&C) and Facilities Services. PD&C manages new construction and renovation projects, while Facilities Services is tasked with maintaining and overseeing all existing University facilities. CLAS Facilities & Operations serves as a liaison and an extension of these departments for CLAS-specific projects.
- UF PD&C https://facilities.ufl.edu/
- Facilities Services: https://www.facilitiesservices.ufl.edu/
- Physical Security: https://security.businessaffairs.ufl.edu/
General Pricing & Estimates
Estimates vary based on existing conditions, square footage, and complexity of project. Below is a very generalized list of prices to help you estimate how much the project may cost. *Pricing is subject to change monthly. (Pricing is based on per determined building specs)
General Pricing & Estimates | |
---|---|
Paint | 100 - 200sq ft: $500.00 - $1000.00 200+ sq ft: $1000.00+ |
Carpet | 100 - 200sq ft: $1,200.00 - $1600.00 200 + sq ft: $1,600.00+ |
Required Surveys | Floor Check per EH&S–Free–CLAS O&F Ceiling Survey: $1,225.00 Air Quality Testing: $1,750.00(Required per Abatement) |
Asbestos Abatement | Floor Abatement: $5,000.00HVAC Installation & Water Piping: Depends on amount |
Plumbing, HVAC,&Electrical will be determined on a case-by-case basis: Basic fees | |
HVAC | Per PostTest & Balance Report: $500.00 |
Electrical | Adding anything new requires a load Calculation report $2,000.00 Adding new outlet: $1,200.00 |
Facilities Services Outages | Depending of the length of the outage and if it is internal or Utilities outage: Average cost per project is around $200.00 |
CLAS Facilities & Operations Contingency | Usually holds 5% contingency per project at the college level |
Still Need Help?
If you are unsure what type of request you have, the CLAS Facilities Services team is available to assist you throughout the process.